NST Project: Wiring Student Rooms


Project goals:
  1. One 10BaseT and one phone line installed for each "bed" in every residence hall (Bowman, Draime, Knowles, Lehman, VanHousen)
  2. Cable infrastructure "future-proofed" for 10 years
  3. Physical and logical configuration of the residential network designed for optimum performance and manageability.


Upcoming meeting: TBA

Project Cabling RFP-type Specifications

Past meeting minutes:

Reference material/NOTES:




Last modified: 5/15/96
Contact: R. Jewett (Email: jewettrj@potsdam.edu)