NST Project: Wiring Student Rooms
Project goals:
- One 10BaseT and one phone line installed for each "bed" in every residence hall (Bowman, Draime, Knowles, Lehman, VanHousen)
- Cable infrastructure "future-proofed" for 10 years
- Physical and logical configuration of the residential network designed for optimum performance and manageability.
Upcoming meeting: TBA
Project Cabling RFP-type Specifications
Past meeting minutes:
Reference material/NOTES:
Last modified: 5/15/96
Contact: R. Jewett (Email: jewettrj@potsdam.edu)